Journal

4. Our under-underground location.

Krypt. Sound: Did you know, Pro Performance are responsible for the entire sound concept design and installation in Krypt? Wolfgang took on the project in 2016 and was involved untill its completion in 2017. Krypt. stands above the standard as a shining example of the Viennese gastro scene. A combination of high-end and high-usability. Fitted […]

Weiterlesen...

3. Racing to a location near you.

SuperCycle Vienna refurbishment: After the non-stop weekend shift in November at Schottenring, Pro Performance know-how was required for another SuperCycle location in the 4th district (Wohllebengasse). Instead of solving sound insulation problems, we were asked to improve the room acoustics for this location. Additionally, we updated, tuned and ‚approved‘ the existing sound set-up.  ► We have […]

Weiterlesen...

2. There for the little guys.

Dark daytime techno event: We are (hopefully) known in the scene for huge sound projects like Grelle Forelle, Red Bull Hanger 7 and the Volksoper. but, we are always there for the little guys as well. (by now we can include the custom-made double bass array in the BASSment at The Loft to this prestigious list). The […]

Weiterlesen...

1. Premium sound is our standard.

Elysia Basel: Objekt „Elysia is usually what I say when I am asked what is the club with the best sound“. -Well considering where you usually play, we will take this wonderful compliment.   Wolfgang Sauter: At Elysia its not about the maximum SPL levels but about the sound quality and the physically perceptible sound.https://groove.de/2016/09/27/clubbericht-elysia-basel-studio-sound-klang/ […]

Weiterlesen...